Yair Bridge (2024-2025)

CIVIL ENGINEERING SERVICES THROUGHOUT SCOTLAND AND UK

Yair Bridge (2024-2025)

Supply of all Labour, Plant and Materials for the Installation of a 33kV ducting Network and associated Telecom Ducting. Installation, Jointing, testing and commissioning of 33kV cables and Fibre Optic Cables. HDD installation required within this Project.

Depositphotos_122753350_XL (1)